This question was posted on ASK OCS platform by an OCS reader.
I have these information – 32 operators, 8 helpers and 2 pressmen are working in a line. Line is working @45% efficiency and line output are 50 pcs/hr. How to derive garment SAM from this information?
We will use the line efficiency calculation formula for deriving garment SAM and following a reverse calculation method.
Efficiency %= (Production x SAM X 100)/(Manpower x Working hoursx60)
You have mentioned that you have line efficiency data (45%). I am assuming that the factory establishes garment SAM and they used SAM for calculating their line efficiency. But somehow you don’t know the garment SAM factory is making currently. You only have the above information. You can derive SAM using the following steps.
Also, you need to be sure that helpers and pressman operations were assigned with SAM. In case helpers’ operations are not assigned with a SAM and not included in the Efficiency calculation, you should exclude them in manpower counting.
- Calculate total manpower (32+8+2 = 42)
- Total Hours Worked in an hour = 42 x 1 hours = 42×60 minutes
- Hourly production = 50 pieces
- Garment SAM (let’s say) = Y
- SAM produced = 50xY
- Line efficiency = 45%
Therefore, as per the efficiency formula,
(Production x SAM X 100)/(Manpower x Working hours x 60)=Efficiency %
50Y*100/(42×60)=45
Y= 45x42x60/50*100=22.68 Minutes
SAM of this garment is 22.68 minutes. In the calculation, production is taken for one hour, so hours worked is also considered for 1 hour. In case, you have the line output of 8 hours, you need to consider 8 hours per worker for calculating hours worked. See more examples in the following table.
| Manpower | Hours worked | Line output | Line Efficiency(%) | Garment SAM |
| 42 | 1 | 50 | 45 | 22.68 |
| 42 | 8 | 400 | 45 | 22.68 |
| 42 | 8 | 500 | 55 | 22.18 |
| 30 | 8 | 800 | 80 | 14.40 |
| 30 | 1 | 100 | 80 | ? |
| 35 | 8 | 1000 | 75 | ? |
I hope the calculation method is clear to you. If you have more questions, you can send your queries through ASK OCS.
Related Post: How to Calculate Hourly Production Target
Leave a Reply